Tuesday, June 24, 2008

Chino Residence

These pictures of this low maintenance landscape in Chino were taken before, during, and just after construction. The plants are newly planted with time still needed for establishment. Most work involved occurred in the hardscape of concrete and brick in both the front and back of the house.




Flags are placed in spots where irrigation spray heads are to be set to achieve proper watering, aka full head-to-head coverage.

before

construction. plywood and stakes are shaped and formed before concrete pour.

after

before

after

before

construction

after